WHAT WE DID…
Faithful and Gould carried out an independent cost and programme comparison between Hadley Steel Frame System and Traditional Blockwork. The objective of the study was to determine the most cost-effective build method in the United Arab Emirates (UAE) on a sample size of 2,000m2 external wall area.
…THE RESULTS
In a typical week with a single 2 + 1 crew, The Hadley Steel Frame proved significantly quicker to install compared to traditional blockwork. This resulted in a reduced overall construction duration.
The Hadley Steel Frame proved to be 14 weeks quicker to install 2,000M2 external wall compared to traditional blockwork.
Based on the findings, the potential benefits of using The Hadley Steel Frame system in lieu of the traditional blockwork are
AND MORE
COST EFFECTIVE
This cost comparison of The Hadley Steel Frame against Blockwork speaks for itself.
There is a significant saving in Main Contractor Time Related Preliminaries when using The Hadley Steel Frame compared to traditional blockwork. The magnitude of this potential cost saving is largely driven by a shorter overall construction duration. In the sample used for the purposes of this study, the savings equaled nearly 4 millions AED.